A dedicated team that works as part of yours
For larger programmes, we build a team around your project: developers, a technical lead and a project manager. The team works on your priorities, in your tools, and grows or shrinks as the work changes.
Discuss a dedicated team
Trusted by teams at
Who is in the team
A team shaped around your work
The size and mix are agreed for each project. A typical team draws on these roles.
Developers
SharePoint, Power BI, Power Apps and Power Automate developers, at the levels the work needs.
Technical lead
Sets the design, reviews the work and is your technical contact.
Project manager
Plans the work, tracks progress and gives you daily updates.
Testers
Test what is built before it reaches your users.
Designers
Interface and report design where the project needs it.
Support
Fixes and small changes after go-live.
When it fits
When a dedicated team makes sense
A team suits work that is too large or too long for one or two developers.
- A multi-part programmeAn intranet, document system and reporting all running together.
- A long roadmapWork that continues for months, with changing priorities.
- A team that has to scaleYou need to add or remove people as the workload changes.
- You want one accountable teamOne lead and one project manager, instead of managing individuals.
How it works
From your request to a developer working for you
Most requests move quickly. You stay in control of who works on your project.
Tell us the role
The skills, the level, the hours and your time zone. A short call is enough.
Meet the developer
We propose a developer for the role and you can meet them before you confirm.
Start
After you confirm, a developer can often start within a week, depending on availability.
Work together
The developer works on your tasks. A project manager from AscenWork keeps work on track and you get daily updates.
Ways of working
Works like part of your team
Our developers work with your people, in your tools, at hours that suit you.
- Remote deliveryDevelopers work remotely, in your tools and on your tasks.
- Overlap with your time zoneWe adjust working hours so you have overlap with your own team, whether you are in the Gulf, Asia Pacific, the UK or the US.
- On-site by agreementVisits or on-site work can be agreed when your project needs it.
- A manager and daily updatesA project manager from AscenWork checks progress and reports back to you every day.
Terms in plain words
Clear terms before work starts
These apply to every engagement.
- NDA firstWe sign an NDA before work starts. Our developers are also bound by confidentiality terms with AscenWork.
- You own the workYou own the code and files we produce.
- Your data stays with youDevelopers work inside your Microsoft 365 or your systems, not on copies of your data.
- Flexible to endOne month minimum, then 30 days notice to end or change the engagement.
Case studies
Microsoft 365 projects we have delivered
Company intranet portal on SharePoint Online for an airport operator
An airport operating company wanted one place for news, corporate information, business systems, media, surveys, events and a staff directory. We built a SharePoint Online intranet with an admin panel, so named editors publish content under controlled rights.
Read the case study →SharePoint · Power Automate · Food and beverageSOP management on SharePoint for a food manufacturer
A bakery ingredients manufacturer wanted procedures that are approved, read and proven to be understood. We adapted our SOP Management product on SharePoint and added reading time with a quiz, renewal and revision, and print-ready controlled copies.
Read the case study →SharePoint · Power Automate · AI and automation · Technology and IT servicesProject management tool on SharePoint with AI analysis
A project management tool built on SharePoint in the customer tenant. It tracks projects, milestones, timesheets and payments, and adds AI analysis through an n8n workflow.
Read the case study →Dedicated team questions
How big is a dedicated team?
It is agreed for each project, based on the work and the budget. Some teams start with a few people and grow.
Can I change the team size later?
Yes. You can add or remove people with 30 days notice.
Who manages the team day to day?
A technical lead and a project manager from AscenWork, who report to you every day. You set the priorities.
Which platforms can the team cover?
SharePoint, Power BI, Power Apps, Power Automate and Copilot and AI work on Microsoft 365.
Who owns the work?
You do. You own the code and files, and we sign an NDA before work starts.
How much does a team cost?
We do not publish a price list. The cost depends on the size and mix of the team. Tell us what you need and we send a written quote.
Contact










