Power BI dashboards for manufacturing and production

A manufacturing dashboard shows how well the plant runs, where defects come from, and whether stock and capacity match demand. Three screens cover it. We build them on your own ERP, machine and quality data.

Request the sample pack

500+projects delivered
350+clients across 15+ industries
15+years building on Microsoft

What it answers

Three questions every plant team is asked

Each screen starts from a question. The figures are the ones that help plant heads, quality leads and planners act this week.

  • How well is the plant running, and why do we lose time?OEE, output against plan, throughput and unplanned downtime, with OEE by week, its components, output by line and downtime by cause.
  • Where do defects come from, and are they falling?Defect rate, first-pass yield, scrap cost and customer returns, with defects by type and by line, and the quality actions still open.
  • Do stock and capacity match demand, and what does it cost?Stock cover, capacity used, gross margin and inventory value, with demand against capacity, inventory by category, margin by product line and items at risk of stock-out.

The screens

Power BI manufacturing dashboard screens

Three screens for plant heads, quality teams and planners. Open one to see it full size. Each comes with filters and drill-through, and we adjust measures, filters and branding to your business.

3 dashboards

Every number on these screens is sample data from a fictional manufacturer. No client data is shown. Your own logo replaces the AscenWork mark at the top left of each report.

Definitions

How we define the main manufacturing measures

Plant figures only compare across lines and months when they are counted the same way every time. We agree how OEE, downtime, yield and stock cover are calculated before we build.

MeasureHow we calculate itWhat to agree first
OEEAvailability times performance times quality.Whether planned stops count against availability.
Unplanned downtimeStopped time not on the production plan, divided by planned production time.How short stops under a few minutes are recorded.
First-pass yieldUnits that pass inspection first time divided by units started.Whether reworked units count as passed.
Defect rateDefective units divided by units produced.Whether defects are counted by unit or by defect.
Stock coverStock on hand divided by average daily demand.The demand period used for the average.
Gross marginRevenue less cost of goods sold, divided by revenue.Which overheads sit in cost of goods sold.

How it works

From these screens to your live dashboard

In a project, the dashboard connects to your ERP, machine and quality data and refreshes on a schedule. You see working pages early, so you react to something real.

Request the sample pack
  1. Connect

    We link your ERP, machine and production records, quality inspection data and inventory, and check the data is complete.

  2. Model

    We join production orders, machines, defects, inventory and costs into one manufacturing model, with the definitions agreed with you.

  3. Design

    We build production, quality and inventory pages, in your look and logo.

  4. Go live

    Reports run with scheduled refresh and access by plant, so each plant head sees their own plant and leadership sees all of them.

What we connect

Where the data for these dashboards comes from

We confirm the sources on a short scoping call. These are the common ones for this dashboard.

ERP and production orders

Orders, bills of material, output and costs from your ERP.

Machine and shop-floor data

Run time, stops and counts from MES, machine logs or the sheets operators fill in.

Quality records

Inspection results, defects and corrective actions.

Inventory and demand

Stock levels, reorder points, forecasts and customer orders.

Access by plant

Row-level security, so a plant head sees their own plant and leadership sees every plant.

Trusted by teams at

  • Samsonite
  • Uno Minda
  • Tata Realty
  • Bajaj
  • Apar Industries
  • IndiGrid
  • Mahanagar Gas
  • Cushman & Wakefield
  • IndianOil Total
  • Mahindra Logistics
  • Rubamin
  • Remsons Industries

Power BI manufacturing dashboard questions

What should a manufacturing dashboard show?

OEE and downtime for production, defects and yield for quality, and stock cover, demand and margin for planning. Start with the decisions each team takes every week.

How do you calculate OEE?

Availability times performance times quality. We agree how planned stops and short stops are recorded before the first build.

Can it connect to our ERP and machines?

Usually yes. Power BI connects to common ERPs, MES systems, databases, Excel and SharePoint. We confirm each source on a scoping call.

Can a plant head see only their own plant?

Yes. With row-level security, each plant head sees their own plant, while leadership sees every plant.

Is the sample pack free?

Yes. The design pack is free, and we email it to you as a PDF. Building dashboards on your own data is a scoped, paid engagement, which we quote after a discovery call.

How do we get a price and a timeline?

Book a free call. We learn your data sources, users and questions, then send a proposal with the scope, the assumptions and the price. Timelines depend on the number of sources and dashboards.

Contact

Get the sample pack, or talk to us about your data